☎ 694 693 6604✉ info@elmykonos.gr
Mykonos & CycladesIG
Pool Waterproofing in Mykonos
ELMYKONOS · MYKONOS

Pool Waterproofing in Mykonos

Pool waterproofing requires continuity across the entire shell and careful detailing around joints, inlets, lights, stairs and overflow channels.

TECHNICAL APPROACH

Organized work with a clear scope

Before a new system is installed, the stability of the shell and condition of previous layers are assessed. The final solution must also be compatible with the selected lining or finish.

What the service can include

  • Pool shell inspection
  • Cracks and construction joints
  • Inlets, lights and penetrations
  • Overflow channels
  • Waterproofing layers
  • Preparation for final finish

How we proceed

  1. 01
    Initial contact

    Send us the project description, location and photographs.

  2. 02
    Site inspection

    We inspect surfaces, measurements and critical technical details.

  3. 03
    Detailed quotation

    We set out the scope, quantities, materials and main stages.

  4. 04
    Execution and handover

    We organize the team, progress and final quality check.

FAQ

Frequently asked questions

Can it be waterproofed without removing the old finish?

It depends on adhesion, compatibility and the cause of the problem.

Do you inspect pool fittings?

Yes. Penetrations and embedded fittings are critical waterproofing details.

When can the pool be filled?

Waiting time is determined by the installed system and product instructions.

IGInstagramWhatsApp
CallWhatsAppQuote